Handover Documents for Artificial Plants: Test Reports, Care Guides and Warranties

Handover documents for artificial plants are easy to overlook until the final weeks of a project, when the main contractor asks for the operation and maintenance file and the fire engineer asks for evidence that the installed planting meets the building's fire strategy. On commercial projects such as hotels, malls, offices and airports, missing documents can delay practical completion and hold up payment. Planning the handover package from the start of procurement makes it straightforward to assemble and protects both the contractor and the building owner.

Why handover documentation matters

Artificial trees and green walls are part of the building's fit-out. Facility managers need to know what was installed, how to look after it and what to do if something goes wrong. Fire safety reviewers need evidence about the materials. Clients need warranty terms they can rely on. A complete handover package:

Fire test reports and material evidence

Fire documentation is usually the most scrutinised part of the handover. Requirements vary by country, building type and the location of the planting, and projects may reference standards such as NFPA 701, EN 13501-1, BS 476 or DIN 4102 B1. Each uses different test methods and classifications, so a report for one standard does not automatically satisfy another.

Good practice for contractors:

  1. Confirm the requirement early: ask the project fire engineer or local authority which standard and classification apply, and record the answer in writing.
  2. Specify accordingly: order fire-retardant materials where required. Sharetrade offers fire-retardant options and can provide test reports on request.
  3. Match reports to products: check that each test report covers the materials actually supplied, such as the specific leaf fabric or plastic, rather than an unrelated product.
  4. Check dates and scope: note the test date, the laboratory, the standard and what was tested. Ask questions if anything is unclear.
  5. Include the whole assembly: for green walls, backing boards and frames may need their own evidence.

Do not describe products as certified to a standard unless the documentation supports that exact claim. Present the reports as received and let the fire engineer make the assessment.

Product and material information

Alongside fire evidence, the handover file should describe what was installed. Include for each item:

Manufacturers with an organised quality system can usually provide this information quickly. Sharetrade, for example, displays BSCI, FSC, ISO 9001, REACH, RoHS and SGS marks on its website; ask your supplier which documents relate to the specific products on your project.

Care and cleaning guides

Most damage to artificial plants after handover comes from incorrect cleaning. A clear, short care guide written for facility staff prevents this. It should cover:

Keep the guide practical. Photographs of correct cleaning are more useful than long text.

Warranties and their conditions

Warranty terms should be agreed with the supplier before order and passed to the client in writing at handover. Make sure the client understands:

  1. What the warranty covers, such as manufacturing defects in materials and workmanship.
  2. What it excludes, for example vandalism, impact damage, incorrect cleaning or use outdoors of indoor-only products.
  3. How long it lasts and when it begins, typically at delivery or handover.
  4. How to make a claim and what evidence is needed, such as photographs and order references.
  5. How the installer's workmanship warranty, if any, relates to the manufacturer's product warranty.

Avoid offering terms to the client that go beyond what your supplier provides to you, unless you have priced that risk.

As-built records and spare stock

Finish the package with records that make future maintenance easy:

Conclusion

A complete handover package for artificial plants combines fire test reports matched to the supplied products, clear material information, a practical care guide, written warranty terms and as-built records. Request these documents from your supplier at the time of order, not at the end of the job, and assemble them as the installation progresses. That way the planting package closes out cleanly and the building owner has everything needed to manage it.

Talk to our team

Have questions about this topic or a project in mind? Send your requirements and we will reply with practical recommendations.

  1. 1Send us your brief: products, sizes, quantities, and timeline.
  2. 2Our team replies within one working day with suggestions and a quote.
  3. 3Approve samples, then we move to production and shipping.
We never share your details.